Midcontinent ISO (@miso_energy) 's Twitter Profile
Midcontinent ISO

@miso_energy

Operating the power grid, managing energy markets and planning the future grid reliably, cost-effectively.

ID: 771944826

linkhttps://www.misoenergy.org calendar_today21-08-2012 17:49:43

4,4K Tweet

8,8K Followers

535 Following

Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

MISO was awarded its 7th U.S. patent for new methods to manage Distributed Energy Resources (DERs) in ISO markets, supporting FERC Order 2222. Read more on the MISO Matters blog: ow.ly/18YH50VWsyu #EnergyTwitter

MISO was awarded its 7th U.S. patent for new methods to manage Distributed Energy Resources (DERs) in ISO markets, supporting FERC Order 2222.

Read more on the MISO Matters blog: ow.ly/18YH50VWsyu

#EnergyTwitter
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

MISO offices will be closed on Monday in observance of Memorial Day. We invite you to read our latest MISO Matters blog post as we pause to reflect, remember and honor the brave men and women who gave their lives in service to our country: ow.ly/8CVM50VXXUQ #MemorialDay

MISO offices will be closed on Monday in observance of Memorial Day. 

We invite you to read our latest MISO Matters blog post as we pause to reflect, remember and honor the brave men and women who gave their lives in service to our country: ow.ly/8CVM50VXXUQ
#MemorialDay
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Earlier this evening, MISO issued a load shed request (temporary power outages) of approximately 600 MW in Louisiana to Entergy and Cleco to maintain the reliability of the bulk electric system. High temperatures in Louisiana led to higher-than-expected demand, and with

Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Due to unplanned generation and transmission outages, limited transfer capability into the area, and higher-than-expected power demand, MISO has declared Conservative Operations today to help maintain grid reliability. The power system is stable and we are closely coordinating

Due to unplanned generation and transmission outages, limited transfer capability into the area, and higher-than-expected power demand, MISO has declared Conservative Operations today to help maintain grid reliability. The power system is stable and we are closely coordinating
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

The 2025 OMS-MISO Survey results are now available, highlighting tightening resource margins and shifting seasonal reliability risks as electricity demand grows across the region. This annual collaboration between MISO and OMS helps inform real-world decisions and

The 2025 OMS-MISO Survey results are now available, highlighting tightening resource margins and shifting seasonal reliability risks as electricity demand grows across the region.

This annual collaboration between MISO and <a href="/OrgOfMISOStates/">OMS</a>  helps inform real-world decisions and
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Hot weather is in the forecast this weekend and into next week, which means higher electricity demand across our region. Learn how MISO prepares for high temperatures and works to keep the grid reliable all summer long in our latest blog: ow.ly/NyZ950WcVrs #EnergyTwitter

Hot weather is in the forecast this weekend and into next week, which means higher electricity demand across our region. Learn how MISO prepares for high temperatures and works to keep the grid reliable all summer long in our latest blog: ow.ly/NyZ950WcVrs

#EnergyTwitter
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

It's going to be a hot start to the week across the MISO region. Our skilled operators are closely monitoring grid conditions to keep energy flowing reliably. For the latest grid conditions and real‑time updates, visit our website or download the MISO Mobile App. Website |

It's going to be a hot start to the week across the MISO region. Our skilled operators are closely monitoring grid conditions to keep energy flowing reliably. 

For the latest grid conditions and real‑time updates, visit our website or download the MISO Mobile App.

Website |
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Due to the hot weather and high demand, MISO has issued an EEA1 (Energy Emergency Alert 1) for the North and Central Regions today from 1600-2200 EST. This step allows operators to access additional generation to increase the supply of electricity. MISO is committed to

Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Challenging conditions continue today as hot weather persists across the MISO region and the eastern U.S. We’re closely monitoring grid performance and coordinating with our members to ensure reliable operations. Visit our website for the latest grid conditions:

Challenging conditions continue today as hot weather persists across the MISO region and the eastern U.S. We’re closely monitoring grid performance and coordinating with our members to ensure reliable operations.

Visit our website for the latest grid conditions:
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

MISO offices are closed today in observance of Independence Day. Wishing everyone a safe holiday! #IndependenceDay #FourthOfJuly

MISO offices are closed today in observance of Independence Day. Wishing everyone a safe holiday!

#IndependenceDay #FourthOfJuly
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Stay connected to the power grid wherever you are. With MISO’s mobile app, you can track real-time grid conditions and stay informed during high-heat summer days. Download MISO Mobile now to keep the grid at your fingertips. Apple: ow.ly/9app50WqMnx Google:

Stay connected to the power grid wherever you are.

With MISO’s mobile app, you can track real-time grid conditions and stay informed during high-heat summer days.

Download MISO Mobile now to keep the grid at your fingertips.

Apple: ow.ly/9app50WqMnx
Google:
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

FERC has approved MISO’s Expedited Resource Addition Study (ERAS) proposal, an important step to bring urgently needed generation resources online more quickly. As demand grows and reliability challenges increase, ERAS provides a temporary and collaborative path to support

Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

As the regional transmission organization for the central U.S., MISO is responsible for balancing electricity supply and demand across 15 states. It’s been a hot week across the MISO region, and with more high temperatures ahead, demand is expected to remain elevated. We are

Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

We've had a hot start to the week across the region, and electricity use is high. The system remains stable, and we’re working closely with our member utilities to manage supply and support reliability. We continue to monitor the situation and will provide updates as needed. For

We've had a hot start to the week across the region, and electricity use is high. The system remains stable, and we’re working closely with our member utilities to manage supply and support reliability.

We continue to monitor the situation and will provide updates as needed. For
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Republic Transmission, LLC (an LS Power Company) has been selected as the developer for the Reid Extra High Voltage (EHV) – Indiana/Kentucky State Line (RIKY) 345 kV Competitive Transmission Project. Visit MISO's News Center to learn more: bit.ly/4lQkQ2p.

Republic Transmission, LLC (an <a href="/LSPowerGroup/">LS Power</a> Company) has been selected as the developer for the Reid Extra High Voltage (EHV) – Indiana/Kentucky State Line (RIKY) 345 kV Competitive Transmission Project. Visit MISO's News Center to learn more: bit.ly/4lQkQ2p.
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

In its first cycle, MISO’s Expedited Resource Addition Study (ERAS) received 47 project applications across 12 states, representing more than 26,500 MW of proposed new capacity. MISO continues to evaluate the applications to ensure all requirements are met and will publish the

In its first cycle, MISO’s Expedited Resource Addition Study (ERAS) received 47 project applications across 12 states, representing more than 26,500 MW of proposed new capacity.

MISO continues to evaluate the applications to ensure all requirements are met and will publish the
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Our offices are closed today in observance of the holiday, but our dedicated control room operators are hard at work behind the scenes, monitoring and managing the grid to ensure reliable power for millions across the region. We’re grateful for their commitment and for all the

Our offices are closed today in observance of the holiday, but our dedicated control room operators are hard at work behind the scenes, monitoring and managing the grid to ensure reliable power for millions across the region.

We’re grateful for their commitment and for all the
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Today, MISO announced the first 10 projects to be evaluated under the new Expedited Resource Addition Study (ERAS) process. The projects include five natural gas, three solar, one wind and one battery, totaling approximately 5,300 MW of installed capacity. Along with advancing

Today, MISO announced the first 10 projects to be evaluated under the new Expedited Resource Addition Study (ERAS) process. The projects  include five natural gas, three solar, one wind and one battery, totaling approximately 5,300 MW of installed capacity.

Along with advancing
Midcontinent ISO (@miso_energy) 's Twitter Profile Photo

Stay connected to the power grid anytime, anywhere. With the MISO Mobile app, you can track real-time grid conditions, monitor key system alerts and stay informed during periods of high demand. Download MISO Mobile on the Apple App Store or Google Play today. Apple:

Stay connected to the power grid anytime, anywhere.

With the MISO Mobile app, you can track real-time grid conditions, monitor key system alerts and stay informed during periods of high demand. 

Download MISO Mobile on the Apple App Store or Google Play today. 

Apple: