MarcoRP (@marcorpi1) 's Twitter Profile
MarcoRP

@marcorpi1

Unofficially the best newsfeed for Supercharger (and Semicharger) updates in the United States and Canada.

ID: 821850550543204352

linkhttps://www.google.com/maps/d/viewer?mid=1qwzaWtlxvnU1e_i0VBOOujZ-tzx0oqI&ll calendar_today18-01-2017 22:43:35

16,16K Tweet

7,7K Followers

619 Following

MarcoRP (@marcorpi1) 's Twitter Profile Photo

PepsiCo is building a new Semi Charging station at one of their facilities in Denver, Colorado!! Permits were submitted earlier this month for the addition of 6 Semichargers at the company's Pecos St distribution center. H/T: AlejandroEV66

PepsiCo is building a new Semi Charging station at one of their facilities in Denver, Colorado!!

Permits were submitted earlier this month for the addition of 6 Semichargers at the company's Pecos St distribution center.

H/T: <a href="/AlejandroEV66/">AlejandroEV66</a>
MarcoRP (@marcorpi1) 's Twitter Profile Photo

Supercharger poll for tomorrow, by nearest US Highway. Note: all sites in this poll are located 5mi or more from the nearest Interstate, and all are located closer to a US Highway.

MarcoRP (@marcorpi1) 's Twitter Profile Photo

A new Supercharger is coming soon to Brooklyn, New York!! Permits are in for a 16-stall station at the NetCost Market on Ocean Ave. The site is located about a mile off the Belt Pkwy EB via Shore Parkway (0.25mi from WB via Voorhies Ave).

A new Supercharger is coming soon to Brooklyn, New York!!

Permits are in for a 16-stall station at the NetCost Market on Ocean Ave.

The site is located about a mile off the Belt Pkwy EB via Shore Parkway (0.25mi from WB via Voorhies Ave).
MarcoRP (@marcorpi1) 's Twitter Profile Photo

A new V4 Supercharger is coming soon to Centreville, Virginia!! Zoning permits were filed last week for the installation of 2 V4 folding PSUs at Centre Ridge Marketplace, on Multiplex Dr. The site is located about a mile off Interstate 66 via US-29 and Centreville Rd.

A new V4 Supercharger is coming soon to Centreville, Virginia!!

Zoning permits were filed last week for the installation of 2 V4 folding PSUs at Centre Ridge Marketplace, on Multiplex Dr.

The site is located about a mile off Interstate 66 via US-29 and Centreville Rd.
Phillip.png ⚡🐢 (@pmsyyz) 's Twitter Profile Photo

Tesla no longer has this Supercharger under development on their map. Nothing seen. 9179 Chamberlayne Rd, Mechanicsville, VA 23116 MarcoRP

Tesla no longer has this Supercharger under development on their map. Nothing seen. 9179 Chamberlayne Rd, Mechanicsville, VA 23116 <a href="/MarcoRPi1/">MarcoRP</a>
Tom Hilsabeck (@hils814) 's Twitter Profile Photo

FINALLY!!! Tesla broke ground on the newest Tesla Charging Supercharger site in Durango, Colorado! Bureaucratic red tape and a logistical nightmare of existing infrastructure, but it’s happening!! Sawyer Merritt

FINALLY!!! <a href="/Tesla/">Tesla</a> broke ground on the newest <a href="/TeslaCharging/">Tesla Charging</a> Supercharger site in Durango, Colorado! Bureaucratic red tape and a logistical nightmare of existing infrastructure, but it’s happening!! <a href="/SawyerMerritt/">Sawyer Merritt</a>
MarcoRP (@marcorpi1) 's Twitter Profile Photo

A new Supercharger is coming soon to Wilkesboro, North Carolina!! Permits were submitted last month for an 8-stall station at the Westwood Village Food Mart. The site is located just half a mile south of US-421 via NC-16.

A new Supercharger is coming soon to Wilkesboro, North Carolina!!

Permits were submitted last month for an 8-stall station at the Westwood Village Food Mart.

The site is located just half a mile south of US-421 via NC-16.
AlejandroEV66 (@alejandroev66) 's Twitter Profile Photo

The IONNA Fruita Rechargery looks ready to open. Chargers, canopies, transformer, and meter installed. ⚡️ Just off I-70, and minutes from Colorado National Monument 🌄 This should be the first IONNA site to open in Colorado.

The <a href="/ionnaofficial/">IONNA</a> Fruita Rechargery looks ready to open. Chargers, canopies, transformer, and meter installed. ⚡️

Just off I-70, and minutes from Colorado National Monument 🌄 This should be the first IONNA site to open in Colorado.
MarcoRP (@marcorpi1) 's Twitter Profile Photo

A new Supercharger is coming soon to Farmington, New Mexico!! Permits have been filed for an 8-stall station at the Target on E Main St. The site is located about 5 miles north of US-64, via NM-516 towards Aztec.

A new Supercharger is coming soon to Farmington, New Mexico!!

Permits have been filed for an 8-stall station at the Target on E Main St.

The site is located about 5 miles north of US-64, via NM-516 towards Aztec.