KAREN NZISA (@nzisakaren87797) 's Twitter Profile
KAREN NZISA

@nzisakaren87797

I'm a student engineer

SECRETARY GENERAL DEKUT ESA
A GEO TECHNICAL CIVIL ENGINEER in the making .

ID: 1700069125236617216

calendar_today08-09-2023 08:50:50

20 Tweet

8 Followers

106 Following

ACEK- Future Leaders (@acekfl_kenya) 's Twitter Profile Photo

7/ 🙌 A big thank you to all the participants, speakers, and attendees for making the Inaugural ACEK FL Summit a resounding success! Here's to the future of engineering leadership in Kenya! #ACEKFL2024 #EngineeringTheFuture

7/ 🙌 A big thank you to all the participants, speakers, and attendees for making the Inaugural ACEK FL Summit a resounding success! Here's to the future of engineering leadership in Kenya! #ACEKFL2024 #EngineeringTheFuture
The Association of Consulting Engineers of Kenya (@acek1968) 's Twitter Profile Photo

With delegates from around the world, #ACEKconference2024 is the ultimate gathering for engineers to collaborate and strategize on elevating their businesses and professional profiles. As Ivan Romanov, Director of Viva Fibre Glass, says, 'Our goal is to uplift the engineering

With delegates from around the world, #ACEKconference2024 is the ultimate gathering for engineers to collaborate and strategize on elevating their businesses and professional profiles.

As Ivan Romanov, Director of Viva Fibre Glass, says, 'Our goal is to uplift the engineering
The Association of Consulting Engineers of Kenya (@acek1968) 's Twitter Profile Photo

We had an incredible learning experience at the #ACEKConference2024, led by Eng. Adv Menye David Manga—Consulting Engineer, Adjudicator, Arbitrator, and Chairman of the Engineers Registration Board, Tanzania. The session focused on Adjudication and Arbitration and why consulting

We had an incredible learning experience at the #ACEKConference2024, led by Eng. Adv Menye David Manga—Consulting Engineer, Adjudicator, Arbitrator, and Chairman of the Engineers Registration Board, Tanzania. The session focused on Adjudication and Arbitration and why consulting
ACEK- Future Leaders (@acekfl_kenya) 's Twitter Profile Photo

Only 4 days to go! Have you registered yet? Secure your slot for an amazing fun-filled time this weekend at the ACEK FL #SportsDay 📅 12th Oct. 2024 🕑 8am to 4pm See poster for more details. Registration link: 👇🏽⬇️ tinyurl.com/ACEK-FLSportsD… #ACEKFL #FutureLeaders #October

Only 4 days to go!

Have you registered yet?

Secure your slot for an amazing fun-filled time this weekend at the ACEK FL #SportsDay

📅 12th Oct. 2024
🕑 8am to 4pm

See poster for more details.

Registration link: 👇🏽⬇️
tinyurl.com/ACEK-FLSportsD…

#ACEKFL #FutureLeaders #October
The Institution of Engineers of Kenya (@theiek) 's Twitter Profile Photo

Save the date for the IEK President's Dinner on Wednesday, 11th December 2024, at The Boma Hotel, starting at 6:00 PM. Dress Code: Black Tie Corporate Table: Reserved seating for 10 guests at Ksh 100,000 Charges: • Member: Ksh 4,000 • Non-Member: Ksh 4,500 Click here to

Save the date for the IEK President's Dinner on Wednesday, 11th December 2024, at The Boma Hotel, starting at 6:00 PM.

Dress Code: Black Tie
Corporate Table: Reserved seating for 10 guests at Ksh 100,000
Charges: 
• Member: Ksh 4,000 
• Non-Member: Ksh 4,500

Click here to
KAREN NZISA (@nzisakaren87797) 's Twitter Profile Photo

CHUKA UNIVERSITY ENGINEERING STUDENTS ASSOCIATION launch. The event was a success with DEKUT ENGINEERING STUDENTS ASSOCIATION being well represented by the SECRETARY GENERAL 😁🖐. Together we can 🥳 Together we will✨️✅️ #DESA ❤️ #CUESA♥️ #ENGINEERING

CHUKA UNIVERSITY ENGINEERING STUDENTS ASSOCIATION launch.
The event was a success with DEKUT ENGINEERING STUDENTS ASSOCIATION being well represented by the SECRETARY GENERAL 😁🖐.
Together we can 🥳
Together we will✨️✅️
#DESA ❤️
#CUESA♥️
#ENGINEERING
Eng. Nashon Tambo (@nashon_tambo) 's Twitter Profile Photo

Stakeholders' engagement for Nairobi-Mombasa Expressway (NME) from Lukenya to Mariakani, its numbers: 1. Project cost Ksh. 455 billion 2. Construction timeline is 4 years 3. Concession term is 30 yrs (4 yrs to build & 26 yrs to operate) 4. GoK/KeNHA no contribution (Thread)

Stakeholders' engagement for Nairobi-Mombasa Expressway (NME) from Lukenya to Mariakani, its numbers:
1. Project cost Ksh. 455 billion
2. Construction timeline is 4 years
3. Concession term is 30 yrs (4 yrs to build & 26 yrs to operate)
4. GoK/KeNHA no contribution
(Thread)
Engineers Board of Kenya (@engineersboard) 's Twitter Profile Photo

Welcome On Board: We're thrilled to welcome our incredible sponsors & exhibitors powering the 6th #EPC2025. 🎯 Ministry of Roads & Transport (Ministry of Roads and Transport | Kenya) 🎯 State Department of Roads (State Department For Roads) 🎯LR Foundation (LRF Heritage & Education Centre) 🎯Ministry of ICT (Ministry of Info, Comms & The Digital Economy KE) 🎯Tana Water, Kenya

Welcome On Board: We're thrilled to welcome our incredible sponsors & exhibitors powering the 6th #EPC2025. 
 
🎯 Ministry of Roads &amp; Transport (<a href="/TransportKE/">Ministry of Roads and Transport | Kenya</a>) 
🎯 State Department of Roads (<a href="/Roads_KE/">State Department For Roads</a>)
🎯LR Foundation (<a href="/LRFHEC/">LRF Heritage & Education Centre</a>)
🎯Ministry of ICT (<a href="/MoICTKenya/">Ministry of Info, Comms & The Digital Economy KE</a>)
🎯Tana Water, Kenya