Sahil P (@sahilinfra2) 's Twitter Profile
Sahil P

@sahilinfra2

Infra enthusiast.Optimist
"The internet landed in our laps without creating a curriculum that empowers you to know when someone online is full of shit"

ID: 1399563477769883651

calendar_today01-06-2021 03:08:42

15,15K Tweet

36,36K Followers

0 Following

Sahil P (@sahilinfra2) 's Twitter Profile Photo

1)Used NCMC card from L7/L2A and its works 2)Bought the L3 card too for my dad at Santacruz stn,fill up a form,KYC is done ,amount added via UPI & its ready to use

1)Used NCMC card from L7/L2A and its works 
2)Bought the L3 card too for my dad at Santacruz stn,fill up a form,KYC is done ,amount added via UPI & its ready to use
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Mumbaimetro L12 (Kalyan-Taloja) The piers on the line are unusually tall and slim,i am yet to visit this line so cant comment on the reason for it 📷Arpit Singh

Mumbaimetro L12
(Kalyan-Taloja)
The piers on the line are unusually tall and slim,i am yet to visit this line so cant comment on the reason for it
📷Arpit Singh
Sahil P (@sahilinfra2) 's Twitter Profile Photo

NH148NG Ujjain-Garoth four-lane road project,its a spur of Delhi-Mumbai epwy connectings Garoth on expwy to Ujjain and further to Indore. 📷 Pritam D

NH148NG
Ujjain-Garoth four-lane road project,its a spur of Delhi-Mumbai epwy connectings Garoth on expwy to Ujjain and further to Indore.
 📷 Pritam D
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Sclr-WEH connector Load testing over cable stayed bridge. Street lights being installed too.They have started to remove the temporary support structure from right side (not visible in pic). Can open it by end of June provided it doesnt rain too much

Sclr-WEH connector 
Load testing over cable stayed bridge.
Street lights being installed too.They have started to remove the temporary support structure from right side (not visible in pic).
Can open it by end of June provided it doesnt rain too much
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Pune metro is all set to record its highest average daily ridership figures for a month.The 1st 16 days of June has has achieved average daily ridership of 1.63 lakhs which has been hovering between 1.5-1.6. School,college reopening and hike in PMPML fares all contributing to it

Pune metro is all set to record its highest average daily ridership figures for a month.The 1st 16 days of June has has achieved average daily ridership of 1.63 lakhs which has been hovering between 1.5-1.6. School,college reopening and hike in PMPML fares all contributing to it
Sahil P (@sahilinfra2) 's Twitter Profile Photo

One of the 1st STPs on Dahisar river activated near Sudhir Phadke flyover in Borivali.Trails wil go for sometime.A number of these smaller treatments plants are being constructed over Dahisar,Poisar,Oshiwara rivers to treat waste water before entering into sea 📷 Gopal jhaveri

One of the 1st STPs on Dahisar river activated near Sudhir Phadke flyover in Borivali.Trails wil go for sometime.A number of these smaller treatments plants are being constructed over Dahisar,Poisar,Oshiwara rivers to treat waste water before entering into sea 
📷 Gopal jhaveri
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Mumbaimetro L3 Went to pickup dad returning from Dadar as he couldnt find a rick to home from stn and crowds have increased a lot since ph2 opened.This is T1's exit from across the highway in Vile Parle

Mumbaimetro L3
Went to pickup dad returning  from Dadar as he couldnt find a rick to home from stn and crowds have increased a lot since ph2 opened.This is T1's exit from across the highway in Vile Parle
Sahil P (@sahilinfra2) 's Twitter Profile Photo

SCLR-WEH connector 1)Igirders being placed for BKC bound lanes ,both top and below level. 2)The temporary structure below cable stayed bridge being removed

SCLR-WEH connector 
1)Igirders being placed for BKC bound lanes ,both top and below level.
2)The temporary structure below cable stayed bridge being removed
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Mumbaimetro too has seen a ridership bump although L7/l2A has been seen consistent growth since it opened. A rail based travel for fast & comfortable commute. On a more personal note, my dad has never been happier ever since L3 ph2 opened & values it everytime he uses :) 📷MMOCL

Mumbaimetro too has seen a ridership bump although L7/l2A has been seen consistent growth since it opened. A rail based travel for fast & comfortable commute. On a more personal note, my dad has never been happier ever since L3 ph2 opened & values it everytime he uses :)
📷MMOCL
Sahil P (@sahilinfra2) 's Twitter Profile Photo

Thane-Borivali Twin Tube Road Tunnel Project under SGNP. 11.8 kms 3 lanes each. 1st of 4 TBMs have reached site in Thane and ready to assemble 📷 SACHIN KUMAR

Thane-Borivali Twin Tube Road Tunnel Project under SGNP.
11.8 kms 3 lanes each. 
1st of 4 TBMs have reached site in Thane and ready to assemble
📷
 SACHIN KUMAR