Berg Engineering (@weareberg) 's Twitter Profile
Berg Engineering

@weareberg

ENGINEERING. IT'S A BERG THING!

ID: 3875798840

linkhttp://bergengineering.com.au/ calendar_today13-10-2015 02:10:35

274 Tweet

75 Followers

103 Following

Berg Engineering (@weareberg) 's Twitter Profile Photo

#BergEngineering's new workshop at Gladstone office has been completed with the internal fit out now commencing. First was the installation of the 50t overhead crane, before assembly of our state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill begins.

#BergEngineering's new workshop at Gladstone office has been completed with the internal fit out now commencing. First was the installation of the 50t overhead crane, before assembly of our state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill begins.
Berg Engineering (@weareberg) 's Twitter Profile Photo

There was excitement before the Christmas shut down at the #BergEngineering Gladstone workshop as our new Titan Vertical Boring and Turning Mill completed its journey from Germany ahead of installation works commencing in our new custom-made facility. #itsaBergthing

There was excitement before the Christmas shut down at the #BergEngineering Gladstone workshop as our new Titan Vertical Boring and Turning Mill completed its journey from Germany ahead of installation works commencing in our new custom-made facility.
#itsaBergthing
Berg Engineering (@weareberg) 's Twitter Profile Photo

It was perhaps less exciting after the Christmas break for Jackson, tasked with cleaning some of the Titan's components ahead of installation under the watchful eye of his Father Rick! As a family owned business #BergEngineering also consider #ourteamourfamily. #ItsaBergthing

It was perhaps less exciting after the Christmas break for Jackson, tasked with cleaning some of the Titan's components ahead of installation under the watchful eye of his Father Rick! As a family owned business #BergEngineering also consider #ourteamourfamily.
#ItsaBergthing
Berg Engineering (@weareberg) 's Twitter Profile Photo

The installation team at our #BergEngineering Gladstone workshop have been busy, with the reassembly of our new Titan Double Column Vertical Boring and Turning Mill nearing completion. The 4.3m diameter, 41 tonne Lathe Chuck and double columns are now installed. #itsaBergthing

The installation team at our #BergEngineering Gladstone workshop have been busy, with the reassembly of our new Titan Double Column Vertical Boring and Turning Mill nearing completion. The 4.3m diameter, 41 tonne Lathe Chuck and double columns are now installed. #itsaBergthing
Berg Engineering (@weareberg) 's Twitter Profile Photo

Another #precisionmachining and welding job successfully completed by the #BergEngineering Brisbane Workshop. This Worm Wheel Spider Hub for one of our Alumina industry clients was fully prepped machined, welded, drilled and slotted here at Berg. #itsaBergthing

Another #precisionmachining and welding job successfully completed by the #BergEngineering Brisbane Workshop. This Worm Wheel Spider Hub for one of our Alumina industry clients was fully prepped machined, welded, drilled and slotted here at Berg. 
#itsaBergthing
Berg Engineering (@weareberg) 's Twitter Profile Photo

At #BergEngineering we know our Alumina clients demand the best on their assets that are working in the harshest in-service environments. Pictured here is the highest quality Nickel overlay #welding delivered by GMAW-Pulsed Spray Transfer. Berg Engineering; the welding experts.

At #BergEngineering we know our Alumina clients demand the best on their assets that are working in the harshest in-service environments. Pictured here is the highest quality Nickel overlay #welding delivered by GMAW-Pulsed Spray Transfer. Berg Engineering; the welding experts.
Berg Engineering (@weareberg) 's Twitter Profile Photo

Demonstrating our state-of-the-art #welding equipment & expertise; #BergEngineering BNE Workshop is conducting weld testing on a Nickel based powder using our programmable Plasma Transferred Arc Welding system. For finer welding details; Berg Engineering are the welding experts.

Demonstrating our state-of-the-art #welding equipment & expertise; #BergEngineering BNE Workshop is conducting weld testing on a Nickel based powder using our programmable Plasma Transferred Arc Welding system. For finer welding details; Berg Engineering are the welding experts.
Berg Engineering (@weareberg) 's Twitter Profile Photo

Excitement is building at the #BergEngineering Gladstone Workshop as the reassembly of our new Titan Double Column Vertical Boring & Turning Mill is finalised. The official unveiling of the machine will take place on the 20th Feb at the Berg Engineering Open Day. #itsabergthing

Excitement is building at the #BergEngineering Gladstone Workshop as the reassembly of our new Titan Double Column Vertical Boring & Turning Mill is finalised. The official unveiling of the machine will take place on the 20th Feb at the Berg Engineering Open Day. #itsabergthing
Berg Engineering (@weareberg) 's Twitter Profile Photo

Demonstrating the #welding expertise of #BergEngineering BNE; deep narrow gap welding using GMAW Pulsed Spray Transfer Mode, paired with a Metalcore filler material. This process provides near SAW deposition rates without the need for expensive welding & manipulation equipment.

Berg Engineering (@weareberg) 's Twitter Profile Photo

BIG ANNOUNCEMENT! Berg's $3m Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill & purpose-built workshop facility will be officially unveiled this Thurs 20th Feb as part of the #BergEngineering Gladstone Open Day. Check out this sneak peak of what the Titan can do!

Berg Engineering (@weareberg) 's Twitter Profile Photo

Last 20th Feb, #BergEngineering host an Open Day at our Gladstone Workshop. The highlight of the day was the unveiling of our new state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill. This new machine, thought to be QLD’s largest machine of its kind.

Last 20th Feb, #BergEngineering host an Open Day at our Gladstone Workshop. The highlight of the day was the unveiling of our new state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill. This new machine, thought to be QLD’s largest machine of its kind.
Berg Engineering (@weareberg) 's Twitter Profile Photo

#BergEngineering were delighted today to have the opportunity to showcase our new state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill to delegates from the QLD Government Department of State Development, Manufacturing, Infrastructure & Planning.

#BergEngineering were delighted today to have the opportunity to showcase our new state-of-the-art Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill to delegates from the QLD Government Department of State Development, Manufacturing, Infrastructure & Planning.
Berg Engineering (@weareberg) 's Twitter Profile Photo

It's been 2 weeks since #BergEngineering hosted our Open Day at our Gladstone Workshop. A robust panel discussion with leading industry experts & the unveiling of our new state-of-the-art #Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill Here's a wrap-up of the day

Berg Engineering (@weareberg) 's Twitter Profile Photo

#BergEngineering BNE Workshop are undertaking a track pad refurbishment project. Works have included disassembly, removal of old bushes, measuring & documentation of all bores, #machining of the track pad bores & manufacture of new bushes & pins including heat treatment.

#BergEngineering BNE Workshop are undertaking a track pad refurbishment project. Works have included disassembly, removal of old bushes, measuring & documentation of all bores, #machining of the track pad bores & manufacture of new bushes & pins including heat treatment.
Berg Engineering (@weareberg) 's Twitter Profile Photo

Purchase, disassembly, shipping & reassembly of #BergEngineering's #Titan SC 40/50-4HY Double Column Vertical Boring & Turning Mill & construction of its home in Gladstone is the largest facility project Berg has undertaken. Cooper McKenzie have put together this time-lapse for us

Berg Engineering (@weareberg) 's Twitter Profile Photo

The #BergEngineering Gladstone workshop recently completed a Trolley refurbishment for one of our valued clients in the Alumina industry. It may possibly be the only trolley in Central Queensland that’s not filled with toilet paper right now!🛒🧻 #itsaBergthing #alumina

The #BergEngineering Gladstone workshop recently completed a Trolley refurbishment for one of our valued clients in the Alumina industry. 

It may possibly be the only trolley in Central Queensland that’s not filled with toilet paper right now!🛒🧻 
#itsaBergthing #alumina
Berg Engineering (@weareberg) 's Twitter Profile Photo

We assure clients that #BERGEngineering are continuing our operations in BNE & Gladstone workshops ensuring operations are in line w/ COVID-19 prevention. BERG is ensuring team & customers re maintaining practices & limiting the spread of COVID-19. Click bit.ly/2xlSBFB

We assure clients that #BERGEngineering are continuing our operations in BNE & Gladstone workshops ensuring operations are in line w/ COVID-19 prevention. BERG is ensuring team & customers re maintaining practices & limiting the spread of COVID-19. Click bit.ly/2xlSBFB
Berg Engineering (@weareberg) 's Twitter Profile Photo

The latest addition to the Berg Engineering Gladstone Workshop: a brand new one tonne capacity automatic parts washer. The machine eliminates the need for “hands on” cleaning of parts, thus significantly reducing tool time. #BergEngineering #itsaBergthing

The latest addition to the Berg Engineering Gladstone Workshop: a brand new one tonne capacity automatic parts washer. The machine eliminates the need for “hands on” cleaning of parts, thus significantly reducing tool time.

 #BergEngineering #itsaBergthing