ERICK Architect Daniel Kimathi. Cenas Ojung'a Eng. Kundu Achoka Well it depends on the nature of work. TS is the best as for structures, bolts, where you will be working with ±3mm. Also you will have a chance to put mini prism for greater accuracy. If you are doing Earthworks you can use GPS

Nicholas Mutethia Karuma (@mutethia_karuma) 's Twitter Profile Photo

ERICK Level ni level. The technical proficiency and field craft of the operator make the difference. Topcon products are quite durable and pricey, whereas Bosch is more affordable. They work the same.

ERICK (@jumaherick04) 's Twitter Profile Photo

Why is it that the statistics of GEs transitioning to PEs in Kenyan Engineering industry is very low and irreparable Does it mean that graduate Engineers after schooling get big packaged employment and forget Professional registration? Or its because of lengthy registration need?

Why is it that the statistics of GEs transitioning to PEs in Kenyan Engineering industry is very low and irreparable
Does it mean that graduate Engineers after schooling get big packaged employment and forget Professional registration? Or its because of lengthy registration need?
Nicholas Mutethia Karuma (@mutethia_karuma) 's Twitter Profile Photo

My first survey in coast was a stockpiling survey using aerial and terrestrial measurements. Here, you never mess with elevations you could end up with negative height values. Frame 4: That's me at Kenyatta Beach checking against the MSL, after localizing at nguu tatu SOK Pillar.

My first survey in coast was a stockpiling survey using aerial and terrestrial measurements. Here, you never mess with elevations you could end up with negative height values. Frame 4: That's me at Kenyatta Beach checking against the MSL, after localizing at nguu tatu SOK Pillar.
Eng. Kundu Achoka (@mundu_useful) 's Twitter Profile Photo

Dear Kenyan Engineers, removing Engineers Board of Kenya (EBK) from control of Government should be your single most important prayer. That Cabinet Release that implied this action had good intentions for you!

Sabrima (@sabrimahomes) 's Twitter Profile Photo

A 4 bedroom all en-suite maisonette design sitting on 20x50m parcel of land. Highlights: 1. Spacious Lounge 2. Open plan kitchen with central island 3. Dining with spill out area in the back. 4. En-suite Guest Bedroom 5. Family Room with balcony Access 6. Pantry + Laundry

A 4 bedroom  all en-suite maisonette  design sitting on 20x50m parcel of land.
 
Highlights:
1. Spacious Lounge 
2. Open plan kitchen with central island 
3. Dining with spill out area in the back.
4. En-suite Guest Bedroom
5. Family Room with balcony Access
6. Pantry + Laundry
Eng. Kundu Achoka (@mundu_useful) 's Twitter Profile Photo

At completion of your building project insist on following handover documents; 1. As built drawings 2. building component data 3. Operation and maintenance manuals 4. Asset inventory list 4. Commissioning report You’ll learn their importance as you grow up then thank me later.

Eng. Kundu Achoka (@mundu_useful) 's Twitter Profile Photo

5 Problems you should always entertain; 1. Bank loans 2. Land boundary disputes 3. Tax evasion negotiations 4. Unsecured loans default 5. Workplace Leadership brawls Don’t let small problems waste your precious time.