droneman (@dronemanyt) 's Twitter Profile Photo

Latest Snaps from Samruddhi Mahamarg, Both the pending viaduct from P-16 (pic-1) and P-15 (pic-4) is now 💯% completed. Only major work pending at Vadape Interchange. Full Video - youtu.be/JFKbyL9uXrs #samruddhimahamarg

Latest Snaps from Samruddhi Mahamarg,
Both the pending viaduct from P-16 (pic-1) and P-15 (pic-4) is now 💯% completed.

Only major work pending at Vadape Interchange.

Full Video - youtu.be/JFKbyL9uXrs

#samruddhimahamarg
Aman Sharma (@amankayamhai_) 's Twitter Profile Photo

PM Narendra Modi inaugurated and visited the wildlife rescue, rehabilitation, and conservation centre - Vantara - in Gujarat. Vantara is home to more than 2,000 species and over 1.5 lakh rescued, endangered, and threatened animals.

Sahil P (@sahilinfra2) 's Twitter Profile Photo

NH66 6 laning of Thaliparamba to Muzhappilangad section in Kerala Of it kannur bypass is greenfield section between Pappinisseri & Elayavoor and of it 3 kms section involves intensive ground improvement works over Pullooppi river bank 📷Vamsi Chaitanya

NH66
6 laning of Thaliparamba to Muzhappilangad section in Kerala
Of it kannur bypass is greenfield section between Pappinisseri & Elayavoor and of it 3 kms section involves intensive ground improvement works over Pullooppi river bank
📷Vamsi Chaitanya
🇮🇳 Amαr (@amarrrrz) 's Twitter Profile Photo

Kochi Metro Rail Limited has ramped up construction of the 11.2-km Pink Line (JLN Stadium–Infopark) with a dedicated 8.85-hectare casting yard in Kalamassery. Key progress includes casting of 4 pier caps & 4 U-girders, installation of 307 piles, and setup of quality labs and a

Kochi Metro Rail Limited has ramped up construction of the 11.2-km Pink Line (JLN Stadium–Infopark) with a dedicated 8.85-hectare casting yard in Kalamassery.

Key progress includes casting of 4 pier caps & 4 U-girders, installation of 307 piles, and setup of quality labs and a
Indian Infra (@indiainfra02) 's Twitter Profile Photo

Mumbai-Ahmedabad Bullet Train Project: Sabarmati Stock & Maintenance Depot Update. The largest of three main depots at 83 hectares, almost the size of other two Surat (38 hectares) & Thane (58 hectares) combined. Initially equipped with 14 lines, it will expand to 29 in future.

Mumbai-Ahmedabad Bullet Train Project: Sabarmati Stock & Maintenance Depot Update. The largest of three main depots at 83 hectares, almost the size of other two Surat (38 hectares) & Thane (58 hectares) combined. Initially equipped with 14 lines, it will expand to 29 in future.
AVS (@avs_ind) 's Twitter Profile Photo

Vattappara Viaduct is part of Valanchery–Kappirikkad NH66 stretch -Executed by NHAI, not Kerala PWD ( PA Mohamed Riyas ) -Construction cost 2356.74 Cr, 100% funded by Central Govt -Land acquisition: 1271.10 Cr, Kerala contributed just 310.03 Cr (25%) #NH66 #Vattappara

Vattappara Viaduct is part of Valanchery–Kappirikkad NH66 stretch

-Executed by NHAI, not Kerala PWD ( <a href="/riyasdyfi/">PA Mohamed Riyas</a> )
-Construction cost 2356.74 Cr, 100% funded by Central Govt

-Land acquisition: 1271.10 Cr, Kerala contributed just 310.03 Cr (25%)

#NH66 #Vattappara
Sangeeth (@sangeeth_gvr) 's Twitter Profile Photo

KNR Construction is one of the finest contractors in India. They were way ahead of their schedule even though it was the most challenging section of NH66. The incident that happened in Malappuram is unfortunate but I am sure they will rectify their mistake.